PHASES OF CONSTRUCTION

The WLB Builders Construction Process involves several Phases. As the General Contractor, we will manage to complete a Construction Project successfully. While the exact number of phases might vary slightly depending on the source and specific project, here are our base 5 Fundamental Phases for our clients.

1

plot.png
plot 2.png

Phase 1 Pre-Construction

This Phase involves all the planning and preparation work before actual construction begins. Key activities include project conception, site selection, feasibility studies, securing permits and approvals, design development, budgeting, and creating a construction schedule. Our goal is to ensure that all necessary resources are in place, and the project is well-defined before breaking ground.

excavator.png

2

office.png

Phase 2 Initiation

This Phase marks the official start of construction. WLB Builders mobilizes the construction team and sets up the project site. Activities during this Phase include

site clearing, excavation, site utilities installation, and temporary facilities setup such as the WLB construction office and storage areas. It's all about preparing the site for the main construction work.

3

A1_edited.jpg
GEDC0385.JPG

Phase 3 Construction

The main construction work occurs during this Phase. It involves the actual building of the structure based on the approved plans and specifications. The scope of work can include foundation work, structural framing, MEP (mechanical, electrical, plumbing) installations, interior and exterior finishes, roofing, and landscaping. WLB Builders coordinates subcontractors, manages materials and resources, monitors progress, and ensures quality and safety standards are upheld.

4

house1.png
house 2.png

Phase 4 Testing

After the construction is complete, various systems within the building need to be tested and inspected to ensure they are functioning as intended. This Phase includes testing electrical systems, HVAC (heating, ventilation, and air conditioning), plumbing, fire protection, and other systems. Any issues or deficiencies are identified and rectified before the building is handed over to the owner.

house 3.png

5

pAHc0OZN_4x.jpg

Phase 5 Completion and Handover

In this Final Phase, WLB Builders ensures

that all work is completed to the owner's satisfaction. This includes final inspections, addressing punch-list items (minor remaining tasks or corrections), and obtaining necessary certifications and approvals.

Once all requirements are met, WLB

Builders hands over the completed project to the owner. This may also involve training the owner's personnel on how to operate and maintain the building.

Throughout these Phases, Effective Communication, Collaboration, Project Management, and Quality Control are essential for a successful construction project. Keep in mind that the terminology and specific processes can vary depending on the project's scope, location, and the practices of the general contractor and project team.

WLB Initiation and Construction Phases 

WLB wht.png

HAWAII

91-110  Unit # 303 Hanua St.

Kapolei ,Hawaii 96707

info@wlbuilding.com

1 (808) 784-8364‬

License # CT 38745

CALIFORNIA

952 School St.

Napa, California 94559

1 (707) 225-1318

License # 922759

SOCIALS

  • main about
  • Facebook

© 2016 WLB BUILDERS

bottom of page